Luxury bathroom remodel · Dallas, TX

Luxury Bathroom Remodels, Design-Led

A primary bath finished in marble, brass, and mosaic: double vanities, a freestanding tub, and a rain shower, with every finish selected by your dedicated designer before construction starts. Justin runs the project personally.

  • A dedicated designer, finishes chosen up front
  • Comprehensive estimate within 48 hours of the walkthrough
  • Remodels in 8 to 12 weeks, schedule set before work starts
Primary bathroom at Revere Pl. in Lakewood: white double vanity with brass hardware, freestanding tub, and gray subway-tile shower

Get a Free Estimate

Tell us about the bathroom you want.

I want to

By submitting, you agree that Renovation Sells Dallas may call, text, or email you about your project.

Lakewood primary bath

Revere Pl.: Marble, Brass, and Mosaic

In one of Dallas's most loved neighborhoods, these homeowners chose to invest in the house they already had. The primary bath is the quiet center of it: white double vanities with brass hardware, a freestanding tub, a gray subway-tile shower with a rain head, and a blue-and-white marble mosaic floor underfoot.

Down the hall, the powder room got floral wallpaper, a brass-framed mirror, and a marble console sink. Both rooms were part of a twelve-week, $350,000 renovation that also rebuilt the kitchen and bar and laid new hardwood floors throughout, so the baths read as part of one house, not a room that was redone on its own.

Freestanding tub beside the gray subway-tile shower at Revere Pl. in Lakewood

Revere Pl., Lakewood

The Bath, the Shower, and the Powder Room

What design-led means

Every Finish Chosen Before We Start

The bathrooms people remember are decided on paper first. Your dedicated designer builds a mood board with you, then selects tile, stone, plumbing, lighting, wallpaper, and hardware within the budget you set. Nothing is ordered until you have seen it together.

  • Stone and tile: marble mosaic floors, stone slab shower walls, and designer tile
  • Brass, fixtures, and lighting chosen as a set, from rain heads to sconces
  • Freestanding tubs and walk-in showers, in the existing layout or a new one when the layout is the problem
  • Vanities, mirrors, and wallpaper that belong to the rest of the house

Justin spent fifteen years in luxury hospitality before building Renovation Sells Dallas, and the project runs that way: one point of contact, a dedicated project manager on site, and real-time photo updates so you never have to chase anyone.

Blue and white marble mosaic bathroom floor at Revere Pl. in Lakewood

Real budgets

Three Primary Baths, Three Homes

Lake Breeze Dr. was a bathroom-only project. The other two were part of a larger renovation, so the budget shown is for the whole project.

Primary bathroom at Revere Pl. in Lakewood: white double vanity with brass hardware, freestanding tub, and gray subway-tile shower

Whole-home renovation · $350K · 12 weeks

Revere Pl., Lakewood

White double vanities, brass hardware, a freestanding tub, a gray subway-tile shower with a rain head, and a blue-and-white marble mosaic floor.

Primary bathroom vanity at Shady Point Dr in Plano after the remodel: white oak double vanity and tall cabinet, black-framed mirrors, brass sconces, and quartz counters

Whole-home remodel · $300K · 9 weeks

Shady Point Dr., Plano

A glass walk-in shower with dual rain heads, a built-in bench, stone slab walls, and a white oak double vanity with brass sconces.

Wet-room style shower with dual rain heads at Lake Breeze Dr. in McKinney

Primary bath · $60K · 5 weeks

Lake Breeze Dr., McKinney

A wet-room layout with green vertical tile, a herringbone niche, two rain showers with brass fixtures, a teak bench, and the family's clawfoot tub kept.

Plano primary bath

From Garden Tub to Walk-In Shower

Shady Point Dr., Plano: part of a nine-week, $300K whole-home remodel.

Shady Point Dr primary bathroom in Plano before the remodel: garden tub under the window and a framed shower stallBefore
Primary bathroom at Shady Point Dr in Plano after the remodel by Renovation Sells Dallas: glass walk-in shower with dual rain heads, a built-in bench, stone slab walls, and a mosaic tile floorAfter
The garden tub and framed stall became a glass walk-in shower with dual rain heads, a built-in bench, and stone slab walls. Drag to compare.

How it works

From Walkthrough to Finished Bath

  1. 01

    Tell Us About Your Home

    After a quick conversation about your home and goals, we schedule an in-person tour.

  2. 02

    Your Estimate Within 48 Hours

    Within 48 hours of the walkthrough you receive a comprehensive, itemized estimate and a list of suggested upgrades.

  3. 03

    Design, Chosen Up Front

    Your dedicated designer builds a mood board with you and selects every finish before anything is ordered.

  4. 04

    Built on a Set Schedule

    Remodels run eight to twelve weeks, and the schedule is set before work starts. A dedicated project manager is on site, with real-time photo updates.

“I cannot say enough good things about Justin and Renovation Sells. His professionalism, quality and attention to detail is unmatched. I would highly recommend him and his team to anyone.”

Loree C., DallasGoogle review

“Justin and his team of experts created our dream bathroom after helping us diagnose damaged plumbing under our foundation. His designer took our ideas and created the perfect mood board which his team of contractors executed flawlessly.”

Joshua R.Google review

“Unbelievably impressed with how responsive and professional this team is. They completed the project quickly without sacrificing any quality of work. We will definitely use for all future renovations.”

James G.Google review

Read more reviews

Bathroom questions

Remodeling a Bathroom at This Level

Straight answers from your local experts. All questions.

How long does a luxury bathroom remodel take?

Remodels run eight to twelve weeks, and we set the schedule before work starts. A single primary bath can be faster: Lake Breeze Dr. in McKinney was finished in five weeks.

What does a luxury bathroom remodel cost in Dallas?

It depends on the stone, the tile, the plumbing fixtures, and whether the layout changes. Our bathroom-only projects have run from $60,000 at Lake Breeze Dr. in McKinney to $160,000 for a Dallas primary bath. The walkthrough and the estimate are free, and the estimate is itemized, so you see what each decision costs before you make it.

Can you change the layout?

Yes. Some bathrooms become new again in the existing layout, and some are reimagined because the layout is the problem. At Shady Point Dr. in Plano the garden tub and framed stall became a glass walk-in shower; at Lake Breeze Dr. the room became a wet-room layout.

Who designs the bathroom?

Your dedicated designer. They build a mood board with you, select finishes and materials within your budget, and make sure the room complements the rest of your home. Every finish is chosen before construction starts.

How do you keep a project on budget?

The estimate is itemized and your designer selects materials within it. If something unexpected comes up behind a wall, we talk about options and costs before anything changes. Nothing is added without your approval.

Which neighborhoods do you work in?

Preston Hollow, Lakewood, Highland Park, University Park, North Dallas, Addison, Plano, Frisco, McKinney, Allen, and the rest of our service area.

Start with a walkthrough

Show Us the Bathroom You Have in Mind

A quick conversation, an in-person walkthrough, then a comprehensive estimate within 48 hours of that visit.

Call (469) 500-3602 Get a Free Estimate